PRE-HEATING SYSTEM > ON-VEHICLE INSPECTION |
| 1. INSPECT LIGHTING DURATION OF GLOW INDICATOR LIGHT |
Turn the ignition switch to ON and measure the duration of time that the light remains illuminated.

| Engine Coolant Temperature °C (°F) | Light Illumination Time (sec.) |
| -20 (-4) | 15 |
| 0 (32) | 10 |
| 10 (50) | 8 |
| 20 (68) | 5 |
| 40 (104) | 3 |
| 2. INSPECT PRE-HEATING |
Turn the ignition switch to ON and measure the length of time that battery voltage is applied to the glow plugs.

Turn the ignition switch to the START position and check that the battery voltage is applied to the glow plugs.
While cranking the engine, measure the length of time that battery voltage is applied to the glow plugs.
| 3. INSPECT AFTER GLOW TIME |
![]() |
Remove the glow plug relay.
| *1 | Front view of wire harness connector (to Glow Plug Relay) |
After the engine starts, measure the length of time that battery voltage remains present.

| Tester Connection | Condition | Specified Condition |
| B11-2 - Body ground | - | Refer to the graph above*1 |